moisture of 5 – 20%), and risks of toxicity and

inflammability of AFR are very high. Lastly, the

belt is to run around the clock, even though the

velocity of the belt is rather slow at 1 m/sec.

136 m of Standard Industrie’s LIFTUBE

was the solution mostly adaptable to such

requirements. Its design allows AFR to

be entirely enclosed and contained in the

conveyor.

USA

Ash Grove Cement, Ash Grove

Bricking Solutions provided Ash Grove

Cement with an Ez Flexx50 Stepped Deck

Bricking Machine with a 4.3 m (14 ft)

4000 kg (8800 lb) work platform, designed for

a 16 ft 6 in. (5 m) size kiln with 220 mm brick.

The flexible arch allows for easy adjustments

inside the kiln for either minor kiln distortion,

or to accommodate conical sections or

ovality. The machine is assembled with pin

connections, and symmetrical part designs

allow assembly to be done without tools and in

under 2 hours.

Bath, Keystone Cement

FCT Combustion has been awarded a

contract to supply a Turbu-Jet burner to fire

100% natural gas, 100% coal and the use

of liquid wastes. The calciner burners are

designed to fire 100% natural gas and the

DDP calciner burner will burn liquid wastes

and natural gas. The scope of the project

also includes the valve trains and burner

management system.

Cape Girardeau, Buzzi Unicem USA

To improve the effective primary air momentum

in the existing M.A.S. burner, Cape Girardeau

plant ordered the upgrade to the latest fifth

generation nozzle head from Unitherm Cemcon.

The upgrade consists of a new set of nozzles

and M.A.S. hoses.

Clinton Plant, Texas Lehigh Cement Company

Texas Lehigh Cement Company has ordered

a new grinding plant to grind granulated blast

furnace slag (GBFS) and produce slag cement.

The new plant will include a KHD ball mill

system and is designed with future expansion

in mind. A future, Phase 2 project will add

a KHD Roller Press to the ball mill circuit to

increase capacity by more than double.

Fairborn Cement Company

Fives has supplied Fairborn Cement Company

with CFD modelling of its precalciner with a

view to firing natural gas.

Holcim Midlothian Cement Plant, LafargeHolcim

Bricking Solutions was chosen to supply the

Holcim Midlothian Cement Plant with a Custom

Kiln Access Ramp designed to support working

demolition equipment with a 6800 kg live load

capacity and a 3:1 safety factor. Heavy Duty

Fall Guards and Brokk Outrigger Matting

supports and protects the bridge during

demolition using a Brokk Machine. Each ramp

is custom designed using high grade 6061-T6

aluminium, and engineered to meet safety

standards.

Leeds plant, Lehigh Cement Company LLC,

Heidelberg

Bricking Solutions supplied the plant with a

Burner Alignment Device with mounting fixture

and Kiln Laser Target.

Lehigh Cement Company

Bedeschi has been awarded an important

contract related to clay crushing and handling

by KHD, Lehigh Mitchell. Bedeschi is supplying

two complete crushing units composed of

an apron feeder and a double roller crusher,

then one blending stacking and reclaiming

longitudinal system for limestone, a clay apron

conveyor and a pipe conveyor for cement 700 m

long.

f

Material: limestone

f

Bulk density : 1.5 t/m

3

.

f

Grain size: < 125 mm (100%).

f

Stacking capacity: 1200 tph.

f

Reclaiming capacity: 650 tph.

Lehigh Cement Union Bridge Plant, Heidelberg

Bricking Solutions supplied the Lehigh Cement

Union Bridge Plant with a Burner Alignment

Device with mounting fixture and Kiln Laser

Target. The Burner Alignment Device includes a

mounting fixture that attaches to the face of the

burner. A laser beam is then projected from the

mounting fixture into the kiln at a self-centring

target for quick and easy burner adjustments to

find the centre line of the kiln.

Louisville, Ash Grove Cement

FCT Combustion supplied two K-Jet calciner

burners to Ash Grove’s Louisville plant in

2019.

The plant also ordered a Ez Flexx50

Bricking machine with a 5.2 m long working

deck and a 6000 kg live load capacity from

Bricking Solutions, designed for 3.8 – 4.7 m

range.

Marine Terminal, McInnis Cement

Following the inauguration of its new terminal

in 2018, McInnis endeavored to expand its

95