cement applications. The scope of supply for

the project includes retrofitting the existing

feeding infrastructure as well as the cement

pneumatic transport into the existing storage

silos.

El Salvador

Cemento Regional, Grupo Industrial Monterrey

Cemengal was commisisoned for the supply

of one Plug&Grind Classic unit with a

production capacity of 90 000 tpy, a ball mill

Ø 2.2 x 9.0 m and 500 kW, and bag filter for

25 000 m³/h. The scope of supply includes

two new steel silos for cement storage and

containerised packing equipment.

Guatemala

Cementos Progreso, S.A.

Bricking Solutions supplied a Burner

Alignment Device with mounting fixture and

Kiln Laser Target for Cementos Progreso,

S.A. The Burner Alignment Device includes

a mounting fixture that attaches to the face

of the burner. A laser beam is then projected

from the mounting fixture into the kiln at a

self-centring target for quick and easy burner

adjustments to find the centre line of the kiln.

Honduras

Choloma plant, Argos

As part of its expansion and consolidation

strategy, Argos has introduced a new grinding

station in Choloma, Honduras.

The first stage of the grinding station was

opened in the third quarter of 2019 and has

a production capacity of 220 000 tpy. The

second phase, to be carried out in 2021, will

increase this capacity by a further 220 000 t.

The project is located on a field of around

4.5 ha. with direct access to one of the main

roads in the country. The project will allow

a high level of automation that will aid the

highly efficient production of bulk cement

and packaging as well as operation and

maintenance.

Panama

Cemento Bayano, CEMEX Panama

To improve the effective primary air momentum

in the existing M.A.S. burner, CEMEX ordered

the upgrade to the latest 5

th

generation

nozzle head. The upgrade consists of a

new set of nozzles, M.A.S. hoses and a

new Pneumo-Deflector nozzle for the solid

secondary fuel channel.

Planta Calzada Larga, CEMEX Panama

Bricking Solutions supplied a Custom Kiln

Access Ramp for Planta Calzada Larga,

designed to support working demolition

equipment with a 6800 kg live load capacity, a

3:1 safety factor and Heavy Duty Fall Guards.

Brokk Outrigger Matting supports and

protects the bridge during demolition using a

Brokk Machine.

Peru

Matarani, Cementos Prima

Cemengal was commissioned to supply one

Plug&Grind XL unit with a production capacity

of 220 000 tpy: ball mill Ø 3.0 x 9.5 m and

1100 kW bag filter for 50 000 m³/h. The

scope of supply includes equipment for raw

material transport from the client’s storage

halls, cement handling equipment for transfer

and steel storage silos as well as dispatching

facilities for cement bags.

Uruguay

Minas, Cementos Artigas

thyssenkrupp has installed a prepol

Step Combustor- Short (SC- S) at the Minas

plant.

With the implementation of a thyssenkrupp

prepol SC- S at an air through kiln line with

1500 tpd production capacity, the retention

time for the thermal utilisation of alternative

fuels can be significantly increased.

At Minas, a maximum substitution rate of

100% was reached with tyre chips at the riser

duct. Even with nearly double the original

installed feedrate, the kiln operation remained

nearly unchanged at a stable level. The

pyrolysis of the tyre chips takes place in the

prepol SC- S with no drop down of tyre chips

in kiln inlet detectable.

Larger sections of the system were

already assembled on ground level, and the

overall installation could be realised in less

than three weeks during an ordinary plant

shutdown.

Minas, Cementos Ancap

Cemengal has been commissioned for the

relocation of a Plug&Grind

®

mill unit at the

Minas plant, and an extension with a new

cement transport system to existing silos.

The scope of supply includes the revamping

of existing clinker storage hall at the Minas

Plant to fit the new dosing bins for the feeding

of Cemengal’s P&G modular mill, as well as

extension of electrical and automation equipment

at the P&G modular electrical room.