The client has optimised their cleaning

technique. The GAD allowed Cantilana to

increase its cleaning capacity and quality while

modulating its budget over a one-year investment

period.

ENCI B.V.

ENCI B.V. placed an order with IBAU Hamburg

for the upgrading of two truck loading stations

and one ship loader with IBAU loading chutes.

Norway

Norcem As, HeidelbergCement Group

Norcem As, part of HeidelbergCement Group,

has awarded Bedeschi the supply of a complete

plant for limestone with a 3000 tph capacity,

self-unloaded by vessel. The supply includes:

f

Receiving tower with hopper, closed with

rubber strings.

f

1 apron feeder (below the receiving hopper).

f

1 transfer belt conveyor from the apron feeder

to the stockpile building (length 115 m).

f

2 filters, one for the receiving tower and one

at the unload of the transfer belt conveyor.

f

1 stacker feeding conveyor.

f

1 tripper.

f

1 traversing bridge stacker.

f

2 filters, one for the tripper unload and one for

the stacker unload.

f

Rail for traversing bridge stacker.

Summary:

f

Material: limestone.

f

Bulk density: 1.6 t/m

3

.

f

Material size: 0 – 225 mm.

f

Design capacity: 3000 tph.

Poland

Cementownia Warta S.A., Dzialoszyn

Bricking Solutions has supplied the plant with an

Ez Flexx50 Stepped Deck Bricking machine with

a 5.2 m long working deck and a 6000 kg live

load capacity, designed for a 4 – 5 m range.

The flexible arch allows for easy adjustments

inside the kiln for either minor kiln distortion, or

to accommodate conical sections or ovality. The

machine is assembled with pin connections, and

symmetrical part designs allows assembly to

be done without tools and under two hours. All

components are modular and can fit through a

1 m x 1 m door.

Gorazdze Cement, HeidelbergCement

Fives has sold and commissioned its second

154 MW PILLARD NOVAFLAM KILN burner for

this plant, which is designed to burn 25 tph of

alternative solid fuel.

Kujawy, LafargeHolcim

In response to the growing market demand,

the Kujawy plant set the clear target for 2020:

increase daily clinker production rate by 4%.

A careful de-bottlenecking study analysis

showed that enlarging kiln bagfilter could be

a suitable option, as high differential pressure

generated by pulse-jet filter was restricting stack

fan capacity. However in mid 2019, a better

solution was chosen: replacement of filter bags

to new type low drag bags, offered by one of the

suppliers.

The fabric technology used in the new bags

(uniformity, fibre covering, weft, warp) guarantees

that differential pressure is kept at the required

16 mbar during 48 months of bagfilter operation.

Previous bags’ performance gradually decreased

over time, giving around 22 mbar dP at end of a

bag’s lifetime.

Replacement of all 5000 bags started in January

2020 during the plant’s winter kiln shutdown.

Field work carried out by the supplier and

supervised by the plant Project Manager took

around three weeks and were completed in time.

After kiln startup and the stabilisation phase,

stack fan power consumption seemed to be

low enough to sustain a higher production rate.

Eventually, the expected daily production rate was

reached on 28 February, and clinker production

since has been kept ca. 5% higher than the

like-for-like period from 2019.

Trzebinia, Gorka

FCT Combustion commissioned a

Gyro-Therm burner with automated control at the

Trzebinina plant, for a long wet kiln producing

high alumina and calcium aluminate clinker. The

target of the project was to improve control of the

thermal profile inside the kiln.

Portugal

Loulé, CIMPOR (OYAK group)

Fives has supplied a Pillard Fuelsystem Heavy oil

installation for the plant.

Russia

Achinsk

Achinsk selected Unitherm for the supply of a

high-performance kiln burner with the patented

Mono Airduct System. The kiln burner is designed

for the combined firing of coal, gas, heavy fuel oil

and secondary fuels.

Asia Cement

After the installation of an M.A.S. Swirlgas

burner in 2017, Asia Cement awarded Unitherm

Cemcon with the delivery of two calciner burners.

85

World Review 2020

World Cement