TWO YEARS

FROM FIRST SKETCH

TO FIRST CLINKER!

WE WANT TO THANK

HEIDELBERGCEMENT,

OUR PARTNERS AND

THE IKN TEAM FOR THEIR

DEDICATION AND HARD

WORK.

New kiln line at Burglengenfeld plant,

Germany

www.ikn.eu

IKN was awarded a contract for engineering, supply and installation to upgrade the pyro line to 4000 tpd - from raw

meal feeding to clinker discharge. The contract included integration engineering, supply and installation of add-on

components for the raw meal grinding plant. The upgraded kiln line features state-of-the-art technology in order to

reach the targeted production level and to comply with future emission limits. The new production line comprises a

two-string, 5-stage preheater tower with inline calciner and Fire Bed Combustor for coarse RDF. IKN’s most modern

preheater and calciner design ensures minimum pressure drop at high performance and efficiency. The kiln line has

been designed for maximum use of a broad range of alternative fuels.

With the upgrading of one of Europe’s most modern clinker lines, IKN is

proud to have been selected as trusted partner for this enormously chal-

lenging project on EPC basis.