f
Replacement of stage 5 cyclones with
new high-efficiency cyclones for calciner
connection and an overall pressure drop
reduction.
f
Bypass mixing chamber installation.
f
A new kiln inlet chamber with orifice.
Due to travel restrictions caused by the
COVID-19 virus, the commissioning of
Donghae Line 6 and 7 is still ongoing.
Malaysia
CMS Cement Industries Sdn Bhd – Sarawak
Bricking Solutions supplied CMS Cement
Industries Sdn Bhd with a Safety Inspection
Cage designed for a 4 m kiln, which allows
two workers to safety walk underneath coating
for inspection or repair work. The safety cage
is designed custom to each kiln size and
brick profile. The cage is rated to withstand
debris weighing 114 kg (250 lb) dropped from
915 mm (36 in.). Each cage is designed with
6061-T6 aluminium making it strong but also
lightweight.
Nepal
Samrat Cement Ltd.
Humboldt Wedag India received an
important order from Samrat Cement in
the last quarter of 2019 for an upgrade
project wherein a ball mill of 3.4 m x 11 m
is being upgraded with a roller press
RP16-170/180 for an output production of
210 tph OPC from an initial production of
55 tph. The scope of supply includes all
mechanical and electrical equipment within
battery limit.
Sunwal, Palpa Cement Industries Private
Limited
The Gebr. Pfeiffer vertical mill in Nepal for
Palpa Cement Industries Private Limited
was installed at the plant in the town of
Sunwal, in the district of Nawalparasi.
The MVR 3350 C-4 with a drive power
of 2150 kW is designed to grind 130 tph
of cement at 3000 Blaine and 100 tph of
blast-furnace cement at 3800 Blaine.
Commissioning of the mill took place in
August 2019.
Pakistan
D.G. Khan Cement Company Limited –
Kalar Kahar
Bricking Solutions supplied a Burner
Alignment Device with mounting fixture
and Kiln Laser Target to D.G. Khan Cement
Company Limited.
The Burner Alignment Device includes a
mounting fixture that attaches to the face of
the burner. A laser beam is then projected
from the mounting fixture into the kiln at a
self-centring target for quick and easy burner
adjustments to find the centre line of the kiln.
The company also supplied a Universal
Safety Cage to Khan Cement Company
Limited.
Kohat Cement
Kohat Cement Company Limited has
successfully commenced commercial
operations from its Brownfield Expansion
Project of 7800 tpd Grey Cement Production
Line (including WHR power plant) from
27 January 2020. After setting up the
additional line, the total installed cement
production capacity of the company has grown
from 2 953 500 tpy to 5 293 500 tpy, showing
a capacity increase of up to 80%.
At its North (KPK) plant, Lucky Cement
has recently installed an additional line of
2.8 million tpy, which has increased the
company’s total production capacity from
9.35 million t to 12.15 million tpy.